- Contact Person : Mr. chen peter
- Company Name : Shangqiu Huahong Mechanical Electrical Equipment Co., Ltd.
- Tel : 86-370-3790369
- Fax : 86-370-3790369
- Address : Henan,shangqiu,south of pingyuan road
- Country/Region : China
- Zip : 476100
2012 Oil yield 60% energy waste tyre oil refinery plant/machine/equipment with best price
2012 Oil yield 60% energy waste tyre oil refinery plant/machine/equipment with best price
Technology:
1. We have already obtained the international PCT(Patent Cooperation Treaty) with application number of PCT/CN2010/080573 for Continuous Pyrolysis Method
2. Increase 5% oil output: take 20 tons capacity for example, our plant brings you 1 ton/per day fuel oil more. The fuel oil is sold with the price around 4500 RMB/Ton, it means you can get 700 USD more per day.
3. Heating method: adopt the latest heating method---take the advantages of both direct heating and indirect heating which brings the following profits:
3.1 Fuel: it saves 20% fuel. Take coal for example, we will save around 100KGS per day. It means you can save 20 USD per day
installation site
the offer of waste tyre Pyrolysis Equipment | |||||
Items | Contents | ||||
1 | Equipment type | HH26-66 | |||
2 | Raw material | waste tyre | |||
3 | Structural form | Horizontal rotation | |||
4 | 24-hour Capacity | 12 ton | |||
6 | Operating pressure | Normal | |||
7 | Marerial of Reactor | Q245R | |||
8 | Thickness of Reactor | 16mm | |||
9 | Rotate speed ofReactor | 0.4turn/minute | |||
10 | Total power | 23.5KW | |||
11 | Mode of cooling | Water cooling | |||
13 | Kind of transmission | Internal gear drive | |||
14 | Noise dB(A) | ≤85 | |||
15 | Size of Reactor(D×L) | 2600×6600 | |||
16 | Working form | Intermittent operation | |||
17 | Delivery time | 15days |
cooling system
customers in our factory
Safety
1. With an auto welding machine for the reactor, it can not only greatly improve working efficiency but also guarantee the quality of welding seam, thus avoid explosion caused by gas leak. Professional heating treatment and x-ray detection chamber are especially for welding.
2. Vacuum system will prevent oil gas from going back to reactor and causing accident.
3. Professional thermometer, pressure gauge and safety valve.
4. It is dangerous to burn exhaust gas (C1 to C4) without any safety measures. In our process, it is transferred first through the safety device and a safety burning air muzzle. Before burning, we should ensure the safety of production.
Long service life
1. Material: Q245R/345R special steel plate, thickness 14-16mm
2. Welding: Automatic welding machine with heating treatment and x-ray detection will prolong the service life of reactor to the max.
3. The service life of the reactor will be 5-6 years
Energy saving:
1. Well sealing for heating system, no gas leak and saving fuel.
2. The exhaust gas will be recycled for reactor heating.
ISO9001
CONSTRUCTION SITE
2012 Oil yield 60% energy waste tyre oil refinery plant/machine/equipment with best price